Where should the Air Bleed Valve be installed?

At the end of the line and at the highest point and/or 6”-12” above the last bubbler/manifold. If you are using a QDPS with an Elbow to cap off the end of your run/line, place the Air Bleed Valve between the last two bubblers of the line or run.
Please, mind that only logged in users can submit questions